Thursday, June 24, 2010

Front-loading a proposal - a key to success


Tasks to do, and/or documents that can be created, at the outset of the proposal. These are items that will end up saving you come proposal crunch time by either having them checked off, preventing you from making a mistake, or just doing better/proper planning -
 
  • Review prior Proposal lessons learned 
    • My employer has a few options for this internally, we can use a message board, write blog-like posts, and have explored a "database" lessons/tips
  • Develop "win themes" that are tied to customer needs
    • And your company's capabilities. This should be obvious, but a lot of people mess this up
  • Create a compliance checklist based off of Sections L and M of the proposal,
  • Review the expressed (and unexpressed) needs, 
  • Develop a proposal schedule
    • Distribute it to your team
    • Manage and execute the proposal to the schedule
  • Review company Past Performances for applicability, 
  • Obtain or develop the Past Performance questionnaire for GPOCs to fill out
    • You'll want to give your POCs as much time as possible to respond, as this always ends up being last on their priorities list.
  • Create proposal template
  • Create or obtain team logos
  • Contact RFP POCs to discuss timelines, ask questions, etc

Saturday, December 19, 2009

How to document an existing system [requirements document]

One of the bigger challenges as an IT Consultant is when you are asked to help define and document an existing system. Here are some of the challenges, thoughts, and considerations on should have:

  • The greatest challenge is balance between real requirements and system constraints.
  • How can one balance what users of a real system expect, versus what they would have at the outset of the system. There is a balance to be maintained between the “real” requirements, which existed before the system was in place and those that now pop into the heads of the developers and users. The odds are they might not have said the system needs x, y, and z integrated functions until they have been using it for several weeks.
  • The document must be instantly useable to guide future development and testing, which is hard. An existing system has existing users, which means there will be requests very soon to change the system (either corrections to bugs, or enhancements). These enhancements might have been deficiencies to the original system design, which did not have the guidance of the user base’s requirements.
  • It HAS to be valuable in analyzing and engineering future system changes; if it doesn’t make sure that future changes don’t conflict with existing functionality, it is not worthwhile.
  • Requirements documents are always a challenge to write, and to be useful in general. Let alone when the system is in place and being used.
  • Is the client committed to using a requirements baseline? Will they maintain it? How will they do so? Who will maintain it and use it?

Reblog this post [with Zemanta]

Friday, August 28, 2009

Trend - Construction materials are declining in cost

I'll be doing several recurring posts here with some snippets from a deliverable I produced for a client. They are a federal government client, who run the facilities for that organization. They asked me to look into some trends affecting the facilities world.

Trend #1 -

The economy will bottom out, potentially Fall 2009, but not boom thereafter. There will be continued real estate challenges for both the construction industry and individuals. The defined end of the recession will also not immediately result in jobs growth, which could be delayed up to a year and a half later. As a result of these economic issues, there has been a one-year 8.92% decrease from the Summer 2008 peak (Turner Building Cost Index).

Questions for the client -
  • Have we seen the corresponding price reductions in construction costs?
  • Do our cost estimate models reflect this?
  • Can we lock in existing materials rates for a long-term period?

Saturday, July 25, 2009

A change in project scope, again

This is not the first time, more like the 8th, that I've been rescoped on my current project assignment.

It doesn't bother me per se, but makes me a bit worried about how my client is viewing my work and WHY they keep asking me to shift gears.

This time I'm doing what can loosely be titled as "operational analysis". What I'm truly doing is a survey of all the activities (non-minor work) within my client's organization, mapping all that work to their four strategic goals (and sub-goals), and doing a standard gap analysis to determine if there is any under/over-investment of time and resources.

This has the *potential* to be rather important. If the results determine that they are under-investing in their strategic goal to develop the skills of their workforce (fourth goal, but what the client leader described at their senior leadership offsite a week ago as priority #1) then they will need to re-scope their work and level of effort.